Menu

Crochet a traffic light description and diagram. Master Class. Craft from colored yarn, crochet “Traffic light. Asterisk on a cap

Ureaplasmosis

"Traffic lights"

Age 1 - 3 months.

Materials:
For kit Pink colour: 120 g of fine pink acrylic yarn, 5 buttons to match.
For kit yellow color: 150 g fine yellow acrylic yarn, 4 buttons to match.
For a light green set: 150 g of light green acrylic yarn, 8 buttons to match.
Spokes No. 2.5 and No. 3.

Set of items in the way of double knitting: auxiliary with a thread of a contrasting color and without a pile, dial the required number of loops and tie 1 p. persons. Then with a thread of the main color, tie 1 p. out. And 4 p. hollow rubber band. Delete Auxiliary a thread.
Hollow gum: knit with an elastic band 1 x 1, while in faces. and out. R. Knit the front loops, and remove the wrong loops, leaving the thread before work.
Fastening the loops with a needle: when fixing the p. of the last p., connected with a hollow elastic band, the needle must be inserted into the 1st person. and 2nd out. p., return, insert the needle into the 2nd and 3rd persons. etc. until all p.
Fantasy Patterns: schemes 1, 2 and 3.
Knitting density: 10 x 10 cm = 40p. x 48r. pattern according to scheme 1; 10 x 10 cm = 33p. x 40r. out. smooth; 10 x 10 cm = 29p. x 35r. patterns according to schemes 2 and 3.

Pink set.

Work description. Jumper.
Right back shelf.
On knitting needles No. 3, dial 44p., Tie 6 p. persons. stitch and continue knitting with a pattern according to scheme 1. At a height of 16 cm, knit the first 3p. persons. stitch and the remaining 41p. out. stitch, evenly decreasing in the 1st p. 8p. = 36p. Reduce for the armhole from the side seam in each 2nd p., Stepping back 3p. from the edge, 11 times in 2p., knitting in 3p. purl together, and close the remaining 14p. The total height is about 25 cm.
Left shelf back.
Knit symmetrically to the right shelf of the back.
Front.
On knitting needles No. 3, dial 94p., Tie 6 p. persons. stitch and continue with a pattern according to scheme 1. At a height of 16 cm, knit the first and last 3p. persons. stitch and central 88p. knit out. stitch, evenly decreasing in the 1st p. 19p. = 75p. Decrease for armholes on both sides in each 2nd p., stepping back 3p. from the edge, 11 times in 2p., knitting in 3p. together out. At a height of 21 cm from the beginning of knitting, close the central 11 stitches for the neckline, on both sides of them in each 2nd p. 1 time for 4p., 3p., 2p. and 1p. When finished reducing the raglan, close last loop. The total height is about 25 cm.
Sleeves.
On knitting needles No. 2.5, using the double knitting method, dial 45p. and knit 2 cm with an elastic band 1 x 1. Continue knitting with needles No. 3 out. stitch, adding in the 1st p. 1p. = 46p. and then add on both sides in every 8th p. 6 times for 1p. = 58p. At a height of 16 cm from the beginning of knitting, reduce the sleeves on both sides in each 2nd p. after 1 chrome 11 times for 2p. and close the remaining 14p. The total height is about 25 cm.
Assembly.
Sew the seams and sew the sleeves into the armholes. On the edges of the shelves of the back on the knitting needles No. 2.5, dial all the loops again, tie 5 p. with an elastic band and close the loops with a needle. Do the same for the neckline. On the fastener bar of the left shelf of the back, make 5 holes for buttons (overcast 1st): the first and last - about 1 cm from each edge, evenly distribute the rest. Sew on buttons. Moisten the product and let it dry.
Work description. Booties.
On needles No. 3, dial 42p. and knit boards. Viscous, adding in every 2nd p. 5 times for 4p. = 62p. Example: 2 persons., add 1p. from a broach and tie a cross. persons., 18 persons., add 1p., 2 persons., add 1p., 18 persons., add 1p., 2 persons. Perform additions on both sides of 18p. then knit 10 p. out. smoothness without additions. For the toe, remove on the auxiliary. knitting the first and last 24p., continue knitting the central 14p. pattern according to scheme 1, knitting together at the end of each row the last loop of the toe with the first loop of the auxiliary. knitting needles 9 times on each side. Resume knitting all 44p. Knit 2 p. pattern according to scheme 1, 14 p. rubber band 1 x 1, 2p. with a hollow elastic band and close the loops with a needle. Knit the second bootie in the same way.
Assembly.
Run seams. Moisten the booties and let them dry.

Yellow kit.

Work description. Jacket.
Back.
On knitting needles No. 3, dial 75p., Tie 6 p. persons. stitch and continue knitting with a pattern according to scheme 2. At a height of 17 cm, close for armholes on both sides in each 2nd p. 1 time 3p. and 3 times for 1p. = 63p. after 8 cm from the beginning of the armhole, close the central 29p for the neckline. and knit 17p. for each shoulder separately. At a total height of 27 cm, finish knitting.
Right shelf.
On knitting needles No. 3, dial 59p., Tie 6 p. persons. stitch and continue knitting with a pattern according to scheme 2. At a height of 14 cm, close 5 stitches for the neckline, in each 2nd p. 3p., 4 times 2p. and in every 4th p. 7 times for 2p. At the same time, at a height of 17 cm, close for the armhole from the side seam in each 2nd p. 1 time 3p. and 3 times for 1p. At a total height of 27 cm cast off 17 stitches. for the shoulder.
Left shelf.

Sleeves.
On knitting needles No. 2.5, using the double knitting method, dial 47p. and knit 2 cm with an elastic band 1 x 1. Continue knitting with knitting needles No. 3 with a pattern according to scheme 2, adding evenly in the 1st p. 4p. = 51p. and then add on both sides in every 10th p. 4 times for 1p. = 59p. At a height of 18 cm from the beginning of knitting, close the sleeves for an okat on both sides in each 2nd p. 3 times for 5p. and the remaining 29p. The total height is about 22 cm.
Assembly.
Sew the seams and sew the sleeves into the armholes. Along the edges of the shelves and the neckline on knitting needles No. 2.5
Cast on all stitches again, knit 5 p. rubber band 1 x 1, 2 p. with a hollow elastic band and close the loops with a needle. On the left shelf, make 2 pairs of holes for buttons (overcast 1p.): The first pair is about 2 cm from the bottom edge and the second is at the beginning of the neckline, the distance between the holes in the pair is 8 cm. Sew on the buttons. Moisten the product and let it dry.
Work description. Beanie.
On knitting needles No. 3, dial 107p., Tie 2 cm with an elastic band 1 x 1, 16 p. according to scheme 2 and continue knitting out. satin stitch. At a height of 12 cm, evenly reduce in each 2nd p. 9 times for 10p. \u003d 17p., Placing all subsequent decreases above the previous ones. Example of 1st decrease: * 7 out., 3p. together out., repeat from * to the end of the row and finish with 7 out. After finishing the decrease, cut off a long thread, thread it through the open stitches and pull it off.
Assembly.
Run a seam. Moisten the product and let it dry.

Light green set.

Work description. Jacket.
Back.
On knitting needles No. 3, dial 75p., Tie 6 p. persons. satin stitch. Continue knitting with a pattern according to scheme 3. At a height of 17 cm, close 3p for armholes on both sides, then subtract in each 2nd p., stepping back 2p. from the edge, 3 times 1p. \u003d 63 p. After 8 cm from the beginning of the armhole, close the central 25 p. for the neckline and on both sides of them in each 2nd p. 2 times for 1p. At a total height of 27 cm cast off 17 stitches. for each shoulder.
Right shelf.
Cast on 51 sts on needles, knit 6 p. persons. satin stitch. Continue knitting with a pattern according to scheme 3. At a height of 17 cm, close 3p for the armhole from the side seam, then subtract in each 2nd p., stepping back 2p. from the edge, 3 times 1p. = 45p. After 2 cm from the beginning of the armhole, close for a cutout on the opposite side of 28p. and knit straight. At a total height of 27 cm cast off 17 stitches. for the shoulder.
Left shelf.
Knit symmetrically to the right shelf.
Sleeves.
On knitting needles No. 2.5, using the double knitting method, dial 47p. and knit 2 cm with an elastic band 1 x 1. Continue knitting with knitting needles No. 3 with a pattern according to scheme 3, adding evenly in the 1st p. 4p. \u003d 51p., And then add on both sides in each 12th p. 4 times for 1p. = 59p. At a height of 18 cm from the beginning of knitting, close the sleeves for an okat on both sides in each 2nd p. 4 times for 5p. and the remaining 19p. The total height is about 22 cm.
Assembly.
Sew the seams and sew the sleeves into the armholes. On the edges of the shelves and the neckline on knitting needles No. 2.5, dial all the loops again, tie 5 p. rubber band 1 x 1, 2 p. with a hollow elastic band and close the loops with a needle. On the right shelf, make 4 pairs of buttonholes (overcast 1p.): The first pair is about 1 cm from the bottom edge, the second pair is about 2 cm from the top edge, and evenly distribute the rest. The distance between the holes in the pair is 8 cm. Sew on the buttons. Moisten the product and let it dry.
Work description. Socks.
For the bootleg on knitting needles No. 2.5, using the double knitting method, dial 43p. and knit 10 cm with an elastic band 1 x 1. For half the heel, continue knitting faces. satin stitch of the first 14p., leaving on the auxiliary. needle 29p. Link 14 p. straight and continue knitting * 7 faces., 2p. together persons., return, 8 out., return, repeat from * 8 times = 6p. The second half of the heel, which corresponds to the last 14p., Tie symmetrically. On the side chrome. sts of the heel again dial 9 sts on each side, combining them with the already existing 27 sts. = 45p. and continue faces. satin stitch. Stop on Aux. needle first and last 16p. and knit the central 13p., knitting together the last p. of the toe from the first p. with auxiliary. knitting needles 5 times for 1p. = 15p. Cut a long thread, thread it through open loops, pull it off and fasten off. Knit the second sock in the same way.
Assembly.
Run the seam, considering that half of the elastic of the shaft is turned away. Moisten the finished socks and let them dry.

"Traffic lights"

Age 1 - 3 months.

Materials:
For the pink set: 120 g of fine pink acrylic yarn, 5 buttons to match.
For the yellow set: 150 g of yellow fine acrylic yarn, 4 buttons to match.
For a light green set: 150 g of light green acrylic yarn, 8 buttons to match.
Spokes No. 2.5 and No. 3.

Set of items in the way of double knitting: auxiliary with a thread of a contrasting color and without a pile, dial the required number of loops and tie 1 p. persons. Then with a thread of the main color, tie 1 p. out. And 4 p. hollow rubber band. Delete Auxiliary a thread.
Hollow gum: knit with an elastic band 1 x 1, while in faces. and out. R. Knit the front loops, and remove the wrong loops, leaving the thread before work.
Fastening the loops with a needle: when fixing the p. of the last p., connected with a hollow elastic band, the needle must be inserted into the 1st person. and 2nd out. p., return, insert the needle into the 2nd and 3rd persons. etc. until all p.
Fantasy Patterns: schemes 1, 2 and 3.
Knitting density: 10 x 10 cm = 40p. x 48r. pattern according to scheme 1; 10 x 10 cm = 33p. x 40r. out. smooth; 10 x 10 cm = 29p. x 35r. patterns according to schemes 2 and 3.

Pink set.

Work description. Jumper.
Right back shelf.
On knitting needles No. 3, dial 44p., Tie 6 p. persons. stitch and continue knitting with a pattern according to scheme 1. At a height of 16 cm, knit the first 3p. persons. stitch and the remaining 41p. out. stitch, evenly decreasing in the 1st p. 8p. = 36p. Reduce for the armhole from the side seam in each 2nd p., Stepping back 3p. from the edge, 11 times in 2p., knitting in 3p. purl together, and close the remaining 14p. The total height is about 25 cm.
Left shelf back.
Knit symmetrically to the right shelf of the back.
Front.
On knitting needles No. 3, dial 94p., Tie 6 p. persons. stitch and continue with a pattern according to scheme 1. At a height of 16 cm, knit the first and last 3p. persons. stitch and central 88p. knit out. stitch, evenly decreasing in the 1st p. 19p. = 75p. Decrease for armholes on both sides in each 2nd p., stepping back 3p. from the edge, 11 times in 2p., knitting in 3p. together out. At a height of 21 cm from the beginning of knitting, close the central 11 stitches for the neckline, on both sides of them in each 2nd p. 1 time for 4p., 3p., 2p. and 1p. When finished decreasing the raglan, close the last loop. The total height is about 25 cm.
Sleeves.
On knitting needles No. 2.5, using the double knitting method, dial 45p. and knit 2 cm with an elastic band 1 x 1. Continue knitting with needles No. 3 out. stitch, adding in the 1st p. 1p. = 46p. and then add on both sides in every 8th p. 6 times for 1p. = 58p. At a height of 16 cm from the beginning of knitting, reduce the sleeves on both sides in each 2nd p. after 1 chrome 11 times for 2p. and close the remaining 14p. The total height is about 25 cm.
Assembly.
Sew the seams and sew the sleeves into the armholes. On the edges of the shelves of the back on the knitting needles No. 2.5, dial all the loops again, tie 5 p. with an elastic band and close the loops with a needle. Do the same for the neckline. On the fastener bar of the left shelf of the back, make 5 holes for buttons (overcast 1st): the first and last - about 1 cm from each edge, evenly distribute the rest. Sew on buttons. Moisten the product and let it dry.
Work description. Booties.
On needles No. 3, dial 42p. and knit boards. Viscous, adding in every 2nd p. 5 times for 4p. = 62p. Example: 2 persons., add 1p. from a broach and tie a cross. persons., 18 persons., add 1p., 2 persons., add 1p., 18 persons., add 1p., 2 persons. Perform additions on both sides of 18p. then knit 10 p. out. smoothness without additions. For the toe, remove on the auxiliary. knitting the first and last 24p., continue knitting the central 14p. pattern according to scheme 1, knitting together at the end of each row the last loop of the toe with the first loop of the auxiliary. knitting needles 9 times on each side. Resume knitting all 44p. Knit 2 p. pattern according to scheme 1, 14 p. rubber band 1 x 1, 2p. with a hollow elastic band and close the loops with a needle. Knit the second bootie in the same way.
Assembly.
Run seams. Moisten the booties and let them dry.

Yellow kit.

Work description. Jacket.
Back.
On knitting needles No. 3, dial 75p., Tie 6 p. persons. stitch and continue knitting with a pattern according to scheme 2. At a height of 17 cm, close for armholes on both sides in each 2nd p. 1 time 3p. and 3 times for 1p. = 63p. after 8 cm from the beginning of the armhole, close the central 29p for the neckline. and knit 17p. for each shoulder separately. At a total height of 27 cm, finish knitting.
Right shelf.
On knitting needles No. 3, dial 59p., Tie 6 p. persons. stitch and continue knitting with a pattern according to scheme 2. At a height of 14 cm, close 5 stitches for the neckline, in each 2nd p. 3p., 4 times 2p. and in every 4th p. 7 times for 2p. At the same time, at a height of 17 cm, close for the armhole from the side seam in each 2nd p. 1 time 3p. and 3 times for 1p. At a total height of 27 cm cast off 17 stitches. for the shoulder.
Left shelf.

Sleeves.
On knitting needles No. 2.5, using the double knitting method, dial 47p. and knit 2 cm with an elastic band 1 x 1. Continue knitting with knitting needles No. 3 with a pattern according to scheme 2, adding evenly in the 1st p. 4p. = 51p. and then add on both sides in every 10th p. 4 times for 1p. = 59p. At a height of 18 cm from the beginning of knitting, close the sleeves for an okat on both sides in each 2nd p. 3 times for 5p. and the remaining 29p. The total height is about 22 cm.
Assembly.
Sew the seams and sew the sleeves into the armholes. Along the edges of the shelves and the neckline on knitting needles No. 2.5
Cast on all stitches again, knit 5 p. rubber band 1 x 1, 2 p. with a hollow elastic band and close the loops with a needle. On the left shelf, make 2 pairs of holes for buttons (overcast 1p.): The first pair is about 2 cm from the bottom edge and the second is at the beginning of the neckline, the distance between the holes in the pair is 8 cm. Sew on the buttons. Moisten the product and let it dry.
Work description. Beanie.
On knitting needles No. 3, dial 107p., Tie 2 cm with an elastic band 1 x 1, 16 p. according to scheme 2 and continue knitting out. satin stitch. At a height of 12 cm, evenly reduce in each 2nd p. 9 times for 10p. \u003d 17p., Placing all subsequent decreases above the previous ones. Example of 1st decrease: * 7 out., 3p. together out., repeat from * to the end of the row and finish with 7 out. After finishing the decrease, cut off a long thread, thread it through the open stitches and pull it off.
Assembly.
Run a seam. Moisten the product and let it dry.

Light green set.

Work description. Jacket.
Back.
On knitting needles No. 3, dial 75p., Tie 6 p. persons. satin stitch. Continue knitting with a pattern according to scheme 3. At a height of 17 cm, close 3p for armholes on both sides, then subtract in each 2nd p., stepping back 2p. from the edge, 3 times 1p. \u003d 63 p. After 8 cm from the beginning of the armhole, close the central 25 p. for the neckline and on both sides of them in each 2nd p. 2 times for 1p. At a total height of 27 cm cast off 17 stitches. for each shoulder.
Right shelf.
Cast on 51 sts on needles, knit 6 p. persons. satin stitch. Continue knitting with a pattern according to scheme 3. At a height of 17 cm, close 3p for the armhole from the side seam, then subtract in each 2nd p., stepping back 2p. from the edge, 3 times 1p. = 45p. After 2 cm from the beginning of the armhole, close for a cutout on the opposite side of 28p. and knit straight. At a total height of 27 cm cast off 17 stitches. for the shoulder.
Left shelf.
Knit symmetrically to the right shelf.
Sleeves.
On knitting needles No. 2.5, using the double knitting method, dial 47p. and knit 2 cm with an elastic band 1 x 1. Continue knitting with knitting needles No. 3 with a pattern according to scheme 3, adding evenly in the 1st p. 4p. \u003d 51p., And then add on both sides in each 12th p. 4 times for 1p. = 59p. At a height of 18 cm from the beginning of knitting, close the sleeves for an okat on both sides in each 2nd p. 4 times for 5p. and the remaining 19p. The total height is about 22 cm.
Assembly.
Sew the seams and sew the sleeves into the armholes. On the edges of the shelves and the neckline on knitting needles No. 2.5, dial all the loops again, tie 5 p. rubber band 1 x 1, 2 p. with a hollow elastic band and close the loops with a needle. On the right shelf, make 4 pairs of buttonholes (overcast 1p.): The first pair is about 1 cm from the bottom edge, the second pair is about 2 cm from the top edge, and evenly distribute the rest. The distance between the holes in the pair is 8 cm. Sew on the buttons. Moisten the product and let it dry.
Work description. Socks.
For the bootleg on knitting needles No. 2.5, using the double knitting method, dial 43p. and knit 10 cm with an elastic band 1 x 1. For half the heel, continue knitting faces. satin stitch of the first 14p., leaving on the auxiliary. needle 29p. Link 14 p. straight and continue knitting * 7 faces., 2p. together persons., return, 8 out., return, repeat from * 8 times = 6p. The second half of the heel, which corresponds to the last 14p., Tie symmetrically. On the side chrome. sts of the heel again dial 9 sts on each side, combining them with the already existing 27 sts. = 45p. and continue faces. satin stitch. Stop on Aux. needle first and last 16p. and knit the central 13p., knitting together the last p. of the toe from the first p. with auxiliary. knitting needles 5 times for 1p. = 15p. Cut a long thread, thread it through open loops, pull it off and fasten off. Knit the second sock in the same way.
Assembly.
Run the seam, considering that half of the elastic of the shaft is turned away. Moisten the finished socks and let them dry.

Master class for making a demonstration material "Forest traffic light" (crochet)

A forest traffic light is not just a beautiful symbol of autumn, but also a great demonstration material for kids. preschool age! With the help of this craft, children will remember the colors and learn their purpose.

For work we need:
1. For knitting maple leaves:
- scheme maple leaf for crocheting (the pattern can be found on the Internet and choose the one you like);
- woolen threads three colors: red, yellow, green (the green color was not enough, I had to finish it with a gray thread; this did not affect the work in any way, since top part green leaf hid under a yellow leaf.);
-hook No. 4 (The thickness of the yarn determines the size of the hook. It was for this yarn that the hook No. 4 came up. If the yarn is thinner, then the hook gauge will be smaller).

2. For traffic light assembly
- threads white color and a needle

3. To decorate the work:
- a large ladybug made of felt;
- figurines of owls for decorating places where leaves join;
- multi-colored figurines of ladybugs and bees of a smaller caliber (all decor items used in the work are on sale in the departments for needlework and decor)
- Super glue.

First you need to tie three maple leaves according to the scheme.


Then, we arrange the finished sheets as traffic signals: red, yellow, green, by overlaying each other: yellow is superimposed on half of the red sheet, and the top of the green sheet is hidden under it. At the next stage of work, the leaves must be fastened together with a thread. With a few stitches we fasten the leaves along the edges and in the center of the connection.


At the bonding points, we put the owl figurine on super glue so that the threads do not stick out.


Next, you need to decorate the traffic light with ladybugs and bees, also using super glue. Big ladybug we plant in the center, we place the rest of the figures in any order.


The loop completes the work, on which the panel will hang on the wall. It must be completed by typing 15-20 cm air loops. With the help of connecting posts, the eyelet is attached to the top of the red maple leaf.

Olga Komolova

“The most important thing for a person is life” wrote N. A. Ostrovsky.

And the life of a child is doubly expensive. And whether we, adults, bring the necessary knowledge about safety to the mind of the child, will depend on his life.

In our kindergarten passed theme week "Road Safety". The final event of this weeks: an exhibition of children's creativity on topic: "The road through the eyes of children".and we decided to do colored yarn craft.

We needed: yarn different color , hook, PVA glue, cardboard foil tube, colored cardboard: green, yellow, red, scissors, hard wire.

1. Usage Crochet, make chains of brown air loops colors. We apply PVA glue on a cardboard tube and glue a chain of brown colors.


2. We pierce a cardboard tube in the middle and insert the wire.


3. Making a hat out of colored cardboard, we also apply PVA glue and fold a chain of different yarn colors.


4. Cut out three small circle: red, yellow, green out colored cardboard, for eyes traffic light and in the same way we apply PVA glue and glue a chain of air loops in a circle, in accordance with circle color.

5. Glue the eyes on colored circles, insert the wand.

like this « Traffic lights» got us.

Related publications:

Material to do the job:- colored yarn- cardboard - brush - PVA glue - butterfly template Description of work: We are preparing a butterfly template.

Kindergarten is a magical land, a world of fairy tales, magic and wonderful transformations. Who but we, educators, understand this. In March.

Master class from color corrugated paper"Mom's Favorite Flower" Educator: Guryanova I.V., Potapova E.M. Hello colleagues.

I bring to your attention a master class on unconventional technique manual labor"Paintings from yarn". First of all, we need to choose a plot.

Good time of the day. To create a postcard, we need: yarn of 4 colors; colored cardboard; PVA glue, scissors, hook, strip of cardboard.

Purpose: Formation of artistic and creative abilities. Tasks: to develop fine motor skills hands; exercise in working with templates; develop.

My hobby is crocheting. Hello, visitors of my page! Frankly speaking, I am not very good at crocheting, I am an amateur and I know how to knit.